Lumbini Province

1,089-metre Siddhababa tunnel achieves breakthrough

Even if the contractor, China State Construction Engineering Corporation, sticks to the timeline, the tunnel will take over a year before vehicles can operate. 1,089-metre Siddhababa tunnel achieves breakthrough
From his office in Kathmandu, Prime Minister KP Sharma Oli (seen on the giant screen), virtually inaugurates the breakthrough of the 1,089-metre main tunnel of the Siddhababa tunnel project in Tinau, Palpa on Friday. Infrastructure Minister Prakash Man Singh, Finance Minister Bishnu Poudel, and Chinese envoy Chen Song, among others, at the event at project site. Madhav Aryal/TKP
bookmark
Madhav Aryal
Published at : January 24, 2025
Updated at : January 25, 2025 08:07
Palpa

Madhav Aryal

Madhav Aryal is the Palpa correspondent for Kantipur Publications.


×
Top